Skip to main content
e2services — Engineering and Educational Services (P) Ltde2services
Service

Planning, Design & Supervision

Transportation master plans (DTMP, MTMP), urban and land-pooling planning, landfill site planning, environmental and energy planning, and construction planning and scheduling.

Enterprise survey drone on the ground with the e2services field crew and project vehicles

Federalisation moved a great deal of infrastructure decision-making to municipalities and rural municipalities that are now responsible for planning they were never resourced to do. A District or Municipal Transport Master Plan is the instrument that turns a list of local requests into a prioritised, costed programme — and it is only as good as the criteria behind the ranking.

e2services prepares DTMP and MTMP transport master plans, urban plans, land-pooling plans and landfill site plans for local governments. The common thread is prioritisation under a real budget constraint: identifying what exists, what is needed, what each option costs, and which sequence delivers the most access for the money available.

Site selection work — for landfills in particular — is where planning meets our geological and hydrogeological capability. A landfill sited without understanding groundwater and slope stability creates a liability that outlives every official who approved it.

We also carried out the detailed feasibility study of an airport at Ramghat, Surkhet for the Civil Aviation Authority of Nepal, which is planning work of a different kind: siting, terrain, approach surfaces and demand assessed together before capital is committed.

What we deliver

  • Transportation master plans — DTMP and MTMP
  • Urban planning and land-pooling planning
  • Landfill site planning and environmental planning
  • Energy planning
  • Construction planning and scheduling

How the work runs

  1. 01

    Inventory and baseline

    Existing network, facilities and settlement pattern inventoried and mapped, so planning starts from what is actually there.

  2. 02

    Demand and needs assessment

    Access gaps, demand and stakeholder priorities established through survey and consultation with local government and communities.

  3. 03

    Option identification

    Candidate interventions identified, with preliminary cost and technical feasibility established for each.

  4. 04

    Prioritisation and programming

    Options ranked against transparent, weighted criteria and sequenced into a multi-year programme within realistic budget envelopes.

  5. 05

    Implementation planning

    Construction planning, scheduling and procurement sequencing so the plan can actually be executed.

What you receive

  • Transport master plan (DTMP / MTMP) with prioritised programme
  • Network inventory and base mapping
  • Needs assessment and consultation record
  • Prioritisation criteria and ranked intervention list
  • Multi-year investment programme with cost estimates
  • Urban, land-pooling or landfill site plans as applicable
  • Feasibility study reports for identified facilities
  • Construction schedule and implementation plan

Common questions

Do you prepare DTMPs and MTMPs for local governments?

Yes — transportation master plans, both district and municipal, are a published specialisation. The work is as much about defensible prioritisation criteria as about the engineering, because the plan has to survive scrutiny from the wards that did not come first.

Can you assess a site for a landfill or a facility?

Landfill site planning and site selection are part of our planning scope, and we bring our own engineering geology and hydrogeology capability to them rather than treating siting as a purely spatial exercise.

Start a conversation

Need a survey, a design package, or a multi-disciplinary study team?

Tell us about the corridor, basin, or facility. We will respond with the right mix of engineering and field capability.