DPR — Odhari–Dharahi Road (NH 60, 40 km)
Detailed engineering survey, design, and DPR for the Odhari–Dharahi section of NH 60.

Assignment overview
The Odhari–Dharahi section of NH60 runs 40 km through the Sunsari and Morang corridor, carrying the kind of mixed traffic — freight, local, agricultural — that punishes a pavement designed to a single assumption.
e2services delivered detailed engineering survey, design and DPR for the section, working for the Department of Roads' Planning, Monitoring and Evaluation Section.
Corridor survey on a live national highway has its own constraints: the survey has to be dense enough to support earthworks and drainage design while the road stays open. Our own GNSS and UAV capability is what makes that a scheduling problem rather than a traffic-management negotiation.
The DPR package covered alignment, cross sections, pavement and drainage design, structures, quantities and cost estimate to the format the Department procures from.
Need a survey, a design package, or a multi-disciplinary study team?
Tell us about the corridor, basin, or facility. We will respond with the right mix of engineering and field capability.