Skip to main content
e2services — Engineering and Educational Services (P) Ltde2services
Transport

DPR — Singati–Bamplung–Gongar Road (42 km)

Detailed project report preparation for a 42 km mountain road corridor in Dolakha.

Large survey drone lifting off from a grass embankment while the field crew observes

Assignment overview

The Singati–Bamplung–Gongar road runs through Dolakha, terrain that combines steep valley sides with a seismic history — the district was among the worst affected in 2015, and slope stability along its road corridors has not returned to what it was before.

e2services delivered detailed engineering survey and design for the alignment, addressing geometry, drainage and structures against ground conditions where post-seismic slope behaviour remains a live design input rather than a historical footnote.

Roads in this setting are as much a geohazard problem as a geometric one, which is why survey, engineering geology and geotechnical assessment are held within the same firm rather than sequenced between consultants.

Start a conversation

Need a survey, a design package, or a multi-disciplinary study team?

Tell us about the corridor, basin, or facility. We will respond with the right mix of engineering and field capability.