Skip to main content
e2services — Engineering and Educational Services (P) Ltde2services
Hydropower

DPR & Construction Drawings — Upper Ruru Banchu Khola HEP (24.5 MW)

Detailed project report, tender drawings, tender documents, design report and construction drawings for a 24.5 MW hydropower project in Kalikot.

GNSS receiver mounted on a tripod over a painted survey benchmark beside a bridge

Assignment overview

At 24.5 MW, Upper Ruru Banchu Khola is among the larger assignments in the firm's hydropower portfolio, and the scope ran the full distance from detailed project report through to the drawings a contractor builds from.

That end-to-end scope is the part worth noting. A DPR prepared by one party and construction drawings prepared by another is where design intent gets lost — assumptions about foundation conditions, sediment handling or access that were reasoned through at study stage quietly disappear. Carrying both meant the drawings inherited the reasoning.

Deliverables covered the design report, tender drawings and tender documents used to procure the works, and the construction drawing set issued for execution in Kalikot's difficult access conditions.

Start a conversation

Need a survey, a design package, or a multi-disciplinary study team?

Tell us about the corridor, basin, or facility. We will respond with the right mix of engineering and field capability.