Skip to main content
e2services — Engineering and Educational Services (P) Ltde2services
Hydropower

Topographical Survey & Detailed Feasibility — Ghatte Khola SHP (5 MW)

Topographical survey and detailed feasibility study report for a 5 MW small hydropower project in Rasuwa.

GNSS receiver mounted on a tripod over a painted survey benchmark beside a bridge

Assignment overview

Rasuwa's terrain makes survey the governing constraint on a small hydropower study — steep, seismically active ground where a headworks or penstock alignment drawn from coarse contours will not survive contact with the site.

The assignment combined topographical survey with the detailed feasibility study itself, so that layout alternatives were tested against a surface the team had measured rather than inherited.

The output was a decision-ready feasibility report for the 5 MW scheme, covering hydrology, layout, preliminary design and cost.

Start a conversation

Need a survey, a design package, or a multi-disciplinary study team?

Tell us about the corridor, basin, or facility. We will respond with the right mix of engineering and field capability.